Recent work

Check out some of our recent projects

La Hougette School Guernsey La Hougette School Guernsey                     Images of the storm damaged roof before we started works. Half of the original roof covering had been torn off by high winds. These images show the completed works. The new roof covering Kingspan KS1000RW insulated panels.
Innovate Signs Innovate signs, 15, Barnes Wallis rd, segensworth Fareham             These images show the old existing roof, with the protective plastisol coating nearly completely worn away. This is a double skin roof, consisting of internal lining panels, then galvanised spacers, 100mm high. Between these spacers, fibreglass cladding Matt, 100mm thick. Then the 0.7mm top sheet that you can see within the images These images show the new roof covering.
YMCA Botley Gutter Damage Images of the existing gutter storm damage.   Works completed mid May 2023.
Longmoor Farm Chandlers Ford These images show the roof being loaded out with KS1000RW insulated panels.   Roof complete, using hook bolts to the existing concrete purlins. Many of today’s farm structures have the old concrete purlins Internal images
Sparshatts Park Gate Old leaking flu’s.   Using plastisol colour coated flat plate, this removes the issues of water damming behind the flu. Plus new rubber decktite. Completed March 2023.
Lyndhurst Fire Station   images are of the original fibre cement sheets having been removed. These works were completed March 2023.   These images show the KS1000LP panels been raised to the roof level. Then images of the finished roof using these panels. Images of the new guttering and verve flashings.  
Penton Saw Mill – Andover   Work completed at Penton Saw Mill in Andover December 2022 Before Project Completed Project
Macadam Way – Andover   This was an over clad project using 32/1000 single skin profiled sheets, plastisol colour coated, colour being goosewing grey. Before Project Completed Project
Norvik Foods – Grisby   Started, Sept 2021, finished, Nov 2021. Single skin metal sheets, over lay, fixed to galvanised top hat sections drilled to the existing brickwork.   Before Project Completed Project
Nature Delivered – Hayes    Fixing galvanised top hat sections ready to receive the new roofing sheets, the roof laid and finished incorporating the fall arrest system. Completed works for the over roof at Nature delivered Hayes, complication date, 8/9/20    Before Project Completed Project